Projects
Winter road to 1PO Severo-Yamburskoye field, GPN-GEO | |
GaspromNeft – Snabzheniye LLC — Client
SK RusWelding LLC — Contractor Duration of works: 30 December 2022 — 15 May 2023 Type of works: preparation and operation of winter vehicle roads and driveways at Severo-Yamburskoye license block in winter 2022 – 2023 for Sever division of GaspromNeft – Snabzheniye LLC Project description: SK RusWelding LLC built a winter vehicle road about 25 km long crossing the gas pipeline and maintained about 63 km of the existing winter vehicle roads |
Winter road to 1PO North Severo-Yamburskoye field, GPN-GEO | |
GaspromNeft – Snabzheniye LLC — Client
SK RusWelding LLC — Contractor Duration of works: 11 January 2022 — 15 May 2022 Type of works: Construction and maintenance of the winter vehicle road at Severo-Yamburskoye license block (2021 – 2022) Project description: SK RusWelding LLC built a winter road about 25 km long crossing the gas pipeline with its subsequent maintenance in 2021 – 2022. The construction area is characterized by long harsh winters and severe changes in temperature. |
Sublease of Port Yamburg | |
GaspromNeft – Snabzheniye LLC — Sublessee
SK RusWelding LLC — Lessee Sublease term: 9 June 2022 — 30 November 2022 Project description: SK RusWelding LLC provided about 100,000 sq.m. of port station Yamburg to GaspromNeft – Snabzheniye
|
Always open
for cooperation
CONTACTS
119517, Moscow, Aminevskoe road 6, Tower K2, 10th floor
+7 (495) 727-94-71
HR (Moscow): 402
HR (NUR): 730; 789
office@ruswelding.ru