Works at Onshore Industrial Site of the Kirinskoye Field | |
RusGasShelf LLC — Contractor
SK RusWelding LLC — Subcontractor Duration of works: 19 December 2022 — 31 March 2024 Type of works: Construction and installation at the onshore industrial site (OPF), stages II and VI of Kirinskoye Gas Condensate Field Development Project description: Construction of onshore industrial site facilities, including energy and transport facilities, communications, water supply, as well as utilities and ancillary facilities |
Site preparation of gas treatment facility and captive power plant sites at the Yuzhno-Kirinskoye Field | |
RusGasShelf LLC — General Contractor SK RusWelding LLC — ContractorDuration of works: 19 September 2022 — 30 July 2023Type of works: Arrangement of site preparation of the gas treatment facility site, including rebuilding of the bridge across river Yasynga and existing vehicle road (stage 1) and captive power plant site (stage 2) expansion.Project description: Set of construction and installation works to prepare the site for installing gas treatment facility and captive power plant (~ 1.2 mln. m3), including deforestation
|
Always open
for cooperation
CONTACTS
Address
119517, Moscow, Aminevskoe road 6, Tower K2, 10th floor
119517, Moscow, Aminevskoe road 6, Tower K2, 10th floor
Phone
+7 (495) 727-94-71
+7 (495) 727-94-71
HR (Moscow): 402
HR (NUR): 730; 789
Email
office@ruswelding.ru
office@ruswelding.ru