PROJECTS
Semakovskoye Gas Field | |
RusGasAlliance LLC — Client
SK RusWelding LLC — Contractor Duration of works: September 2020 – April 2023 Type of works: Construction and installation works on infrastructural and on-site surface facilities at the Semakovskoye Gas Field Project description: I. Infrastructural facilities
II. On-site facilities
|
Semakovskoye Gas Field 1 Stage (TSES) | |
RusGasAlliance LLC — Client
SK RusWelding LLC — Contractor Duration of works: April 2022 — April 2023 Type of works: Construction, installation and commissioning works to equip the site with technical security equipment set (TSES) Project description: installation of the technical security equipment set (TSES) with subsequent commissioning on 57 sites of the Semakovskoye gas field, including on 8 warehousing facilities, a camp, and an export gas pipeline. |
Winter road cluster No.441-r of the Yamburgskoye Field – Gas treatment unit of the Semakovskoye Field (2022) | |
RusGasAlliance LLC — Client
SK RusWelding LLC — Contractor Duration of works: 15 November 2022 — 15 May 2023 Types of works: Construction and maintenance of winter road cluster No. 441-r of the Yamburgskoye Gas Field – Gas treatment unit of the Semakovskoye Gas Field Project description: SK RusWelding LLC built 78.3 km of the winter road, including river ice crossings, and has been maintaining the said road in 2022-2023. |
Maintenance and servicing of vehicle roads, bridge structures, and on-site facilities of the Semakovskoye gas field | |
RusGasAlliance LLC — Client
SK RusWelding LLC — Contractor Duration of works: 1 September 2022 — 31 December 2023 Type of works: Provision of services by specialised vehicles and trucks for the maintenance and servicing of vehicle roads, bridge structures and on-site facilities of the Semakovskoye gas field Project description: SK RusWelding LLC has been maintaining about 18 km of vehicle roads, bridge structures and almost 90,000 sq. m. of the on-site facilities of the Semakovskoye gas field performing the comprehensive set of works necessary to maintain the facilities in good condition. |
Maintenance and servicing of vehicle roads, bridge structures, and on-site facilities of the Semakovskoye gas field | |
RusGasAlliance LLC — Client
SK RusWelding LLC — Contractor Duration of works: 31 January 2023 — 13 June 2026 Type of works: Site preparation works “Semakovskoye gas field development. Phase 1. Stage 3. Groups of gas wells 1.2. Expansion”. Project description: Construction and installation works for the site preparation of the cluster sites for the groups of gas wells of the Semakovskoye field necessary to build new wells (~ 450 thousand m3) as a part of field expansion project, as well as their subsequent cluster sites reclamation. |
Winter road cluster No.441-r of the Yamburgskoye field – Gas treatment unit of the Semakovskoye field (2021) | |
RusGasAlliance LLC — Client
SK RusWelding LLC — Contractor Duration of works: 15 November 2021 — 15 May 2022 Type of works: Construction and maintenance of the winter road cluster No.441-r of the Yamburgskoe gas field – Gas treatment unit of the Semakovskoye field Project description: SK RusWelding LLC built 78.3 km of the winter road, including river ice crossings, and maintained it during 2021 – 2022. |
billion cubic meters of gas
The deposit of natural gas reserves of the Semakovskoye field
The Semakovskoye gas field is located in the Yamal-Nenets Autonomous District (Yamalo-Nenets Autonomous Okrug) in the Taz Bay water area and partly on the land of the Taz Peninsula. It belongs to the category of “large” – recoverable gas reserves are more than 320 billion cubic meters.